Recently, the Provincial Policy Statement 2020 (PPS) provided direction regarding stormwater management, specifically providing balance between environmental an infrastructure requirements and climate change resiliency, adaptation and mitigation. The Town of The Blue Mountains is undertaking a comprehensive Town-wide Drainage Master Plan following the Municipal Class Environmental Assessment Planning Process to serve as a long-term strategy for the Town to manage stormwater in existing and new growth areas. The purpose of the Drainage Master Plan is to:
The Drainage Master Plan will be focused on the settlement areas in the Town including Lora Bay, Thornbury and Clarksburg, Camperdown, Craigleith and Swiss Meadows, the Blue Mountain Village Area and Caste Glen.
The Town has awarded Tatham Engineering Limited the contract for the Drainage Master Plan with the study beginning in the Spring of 2021. The Final Drainage Master Plan Report will be presented to council by the third quarter of 2022.
Daniel Twigger, B.Sc.Eng., P.Eng.
Senior Engineer, Group Leader
Tatham Engineering Limited
Phone: (705) 444-2565 x 2090
Email: dtwigger@tathameng.com
Kevin Verkindt
Senior Infrastructure Capital Project Coordinator
Town of The Blue Mountains
Phone: (519) 599-3131 x 304
Email: icpc@thebluemountains.ca
Senior Infrastructure Capital Project Coordinator
Senior Infrastructure Capital Project Coordinator
519-599-3131 x304