Town-Wide Master Drainage Plan EA

Project Information

Recently, the Provincial Policy Statement 2020 (PPS) provided direction regarding stormwater management, specifically providing balance between environmental an infrastructure requirements and climate change resiliency, adaptation and mitigation.  The Town of The Blue Mountains is undertaking a comprehensive Town-wide Drainage Master Plan following the Municipal Class Environmental Assessment Planning Process to serve as a long-term strategy for the Town to manage stormwater in existing and new growth areas. The purpose of the Drainage Master Plan is to:

  • identify existing and future drainage infrastructure deficiencies and areas of flooding;
  • develop drainage solutions to address these deficiencies, reduce flooding, resolve public safety concerns and improve maintenance opportunities;
  • evaluate the drainage solutions through a risk assessment considering costs, impacts on the environment, and input from the public and interested stakeholders;
  • the selection of a set of preferred solutions to be implemented moving forward;
  • prioritization of the preferred solutions considering available funding, planned development, capital works budgets, infrastructure condition assessments and coordination with other infrastructure (roads, bridges, sanitary and water main) improvement projects; and
  • the development of a policy framework for the management of stormwater in existing and future growth areas. 

The Drainage Master Plan will be focused on the settlement areas in the Town including Lora Bay, Thornbury and Clarksburg, Camperdown, Craigleith and Swiss Meadows, the Blue Mountain Village Area and Caste Glen.

The Town has awarded Tatham Engineering Limited the contract for the Drainage Master Plan with the study beginning in the Spring of 2021. The Final Drainage Master Plan Report will be presented to council by the third quarter of 2022.  

Contact Information

Daniel Twigger, B.Sc.Eng., P.Eng.
Senior Engineer, Group Leader
Tatham Engineering Limited
Phone: (705) 444-2565 x 2090
Email: dtwigger@tathameng.com

Kevin Verkindt
Senior Infrastructure Capital Project Coordinator
Town of The Blue Mountains
Phone: (519) 599-3131 x 304
Email: icpc@thebluemountains.ca

 


Contacts

Senior Infrastructure Capital Project Coordinator
Senior Infrastructure Capital Project Coordinator
519-599-3131 x304